CEI CECC 200025 : 2000
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
PROCESS ASSESSMENT SCHEDULE: PRINTED BOARD ASSEMBLY FACILITIES
Hardcopy , PDF
01-07-2020
English
01-01-2000
Introduction
1 General requirements
2 Quality requirements of the process sequence
3 Specialist Assembly Facility documentation requirements
4 Audits
5 Corrective actions and failure analysis
6 Interface between Assembly Facility and Customer
7 Training
8 Notification of modifications to capability
Annexes
Annex A - Definitions
Annex B - Form and content of process specifications
Annex C - Form and content of Process Manuals
Annex D - Format of first page of Process Approval report
Annex E - Example abstract of description of Process Approval
Annex F - Audit check list (technical)
Annex G - Abbreviations
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.