CSA F418 : 0
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
WIND ENERGY CONVERSION SYSTEMS (WECS) - INTERCONNECTION TO THE ELECTRIC UTILITY
Hardcopy , PDF
05-05-2004
English
Technical Committee on Wind Energy Conversion Systems
(WECS)
Subcommittee on Wind Energy Conversion Systems (WECS) -
Interconnection to the Electric Utility
Preface
1 Scope
2 Definitions
3 Reference Publications
4 General Requirements
5 Owner/User Requirements
5.1 WECS Information
5.2 Site Information
5.3 Modification
6 Utility Requirements
6.1 Utility System Data
6.2 Review Procedure
6.3 Installation Acceptance
7 Operating Requirements
7.1 Line Outages
7.2 System Startup, Safety, and Stability
7.3 System De-energization
7.4 Synchronization
7.5 Commissioning
7.6 Maintenance
7.7 Right of Access
7.8 Remote Monitoring and Control
8 Equipment Requirements
8.1 Installation
8.2 Utility System Transients
8.3 WECS Disconnecting Means (Interconnection Breaker)
8.4 Isolation Transformers
8.5 Fault Protection
9 Performance Requirements
9.1 Voltage
9.2 Power Factor
9.3 Flicker
9.4 Telephone Interference
Figure
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.