1 Scope
2 Normative references
3 Liquid-immersed power transformers rated 501 kVA to 10 MVA,
or with primary windings less than 69 kV
3.1 General
3.2 Inspection and receipt
3.3 Internal inspection
3.4 Handling
3.5 Assembly
3.6 Storage
3.7 Tests
3.8 Energization
3.9 Maintenance
4 Liquid-immersed power transformers rated 10 MVA and above
or with high voltage windings 69 kV and above
4.1 General
4.2 Shipping
4.3 Inspection and receipt
4.4 Internal inspection
4.5 Handling
4.6 Anchorage
4.7 Assembly
4.8 Vacuum treatment
4.9 Field drying of insulation
4.10 Re-Processing
4.11 Tests After the transformer has been assembled and
filled with dielectric liquid
4.12 Energization
4.13 Maintenance
4.14 Storage guidelines
Annex A (informative) Bibliography
A.1 Bibliography
Annex B (informative) Figures and Tables
B.1 Figures and tables
Annex C (informative) Field equipment for oil-filling EHV
transformers and determination of insulation dryness
C.1 Recommended minimum equipment ratings (for new
transformers)
C.2 Determination of insulation dryness
C.3 Shipping Terminology
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.