• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

08/30189566 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BS EN 14825 - AIR CONDITIONERS, LIQUID CHILLING PACKAGES AND HEAT PUMPS, WITH ELECTRICALLY DRIVEN COMPRESSORS, FOR SPACE HEATING AND COOLING - TESTING AND RATING AT PART LOAD CONDITIONS

Available format(s)

Hardcopy , PDF

Language(s)

English

Superseded date

30-04-2012

Superseded by

BS EN 14825:2016

£20.00
Excluding VAT

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 REFERENCE SEASONAL ENERGY EFFICIENCY RATIO (SEER[on])
  4.1 General Formula
  4.2 Weighting factors
  4.3 Air-to-air units
      4.3.1 Temperature conditions for SEER[on] calculation
      4.3.2 Calculation procedure for fixed capacity units
      4.3.3 Calculation procedure for staged capacity control units
      4.3.4 Calculation procedure for continuous variable capacity
            control units
  4.4 Water-to-air units
      4.4.1 Temperature conditions for SEER[on] calculation
      4.4.2 Calculation procedure
  4.5 Air-to-water units
      4.5.1 Temperature conditions for SEER[on] calculation
      4.5.2 Calculation procedure for fixed capacity units
      4.5.3 Calculation procedure for staged capacity control units
      4.5.4 Calculation procedure for continuous variable capacity
            control units
  4.6 Water-to-water and brine-to-water units
      4.6.1 Temperature conditions for SEER[on] calculation
      4.6.2 Calculation procedure
5 REFERENCE SEASONAL COEFFICIENT OF PERFORMANCE (SCOP[on])
  5.1 General Formula
  5.2 Weighting factors
  5.3 Air-to-air units
      5.3.1 Temperature conditions for SCOP[on] calculation
      5.3.2 Calculation procedure
      5.3.3 Supplementary electrical heating
  5.4 Water-to-air units
      5.4.1 Temperature conditions for SCOP[on] calculation
      5.4.2 Calculation procedure
  5.5 Air-to-water units
      5.5.1 Temperature conditions for SCOP[on] calculation
      5.5.2 Calculation procedure for fixed capacity units
      5.5.3 Calculation procedure for staged capacity units
      5.5.4 Calculation procedure for variable capacity units
      5.5.5 Supplementary electrical heating
  5.6 Water-to-water units
      5.6.1 Temperature conditions for SCOP[on] calculation
      5.6.2 Calculation procedure
6 PART LOAD CAPACITY TESTS - COOLING AND HEATING MODE
  6.1 General
  6.2 Basic principles
  6.3 Uncertainties of measurement
  6.4 Test procedures for units with fixed capacity
      6.4.1 Air-to-air and water-to-air units - determination
            of the degradation factor Cd
      6.4.2 Air-to-water and water-to-water units
  6.5 Test procedure for variable capacity units
7 TEST REPORT
8 TECHNICAL DATA SHEET
Annex A (informative) - Compensation method for air-two-water
        units
      A.1 General
      A.2 Compensation system for reduced capacity test in cooling
          mode
      A.3 Compensation system for reduced capacity test in heating
          mode
Annex B (informative) - Calculation examples for SEER[on]
        and SCOP[on]
      B.1 Calculation of SCOP[on]
      B.2 Calculation of SEER[on]
Annex C (informative) - Determination of application SEER/SCOP
      C.1 General
      C.2 Example
          C.2.1 Location
          C.2.2 Building type and use
          C.2.3 Air Conditioner in a Shop
Annex D (informative) - Energy consumption for standby
        mode and crankcase heater

BS EN 14825

Committee
RHE/4
DocumentType
Draft
Pages
35
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

Standards Relationship
PREN 14825 : DRAFT 2017 Identical

£20.00
Excluding VAT