• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

12/30267005 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BS IEC 60076-19 TS ED.1 - POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS

Available format(s)

Hardcopy , PDF

Language(s)

English

Superseded date

30-04-2013

£20.00
Excluding VAT

1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and
   uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty
   contributions
Annex A (Informative) - Example of load loss
        uncertainty evaluation for a large power
        transformer
Annex B (Informative) - Example of load loss
        uncertainty evaluation for a distribution
        transformer

BS IEC 60076-19 TS Ed.1

Committee
PEL/14
DocumentType
Draft
Pages
37
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

IEC 60076-1:2011 Power transformers - Part 1: General
IEC 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers
ISO/IEC Guide 98-3:2008 Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995)

£20.00
Excluding VAT