• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

16/30346107 DC : 0

Current

Current

The latest, up-to-date edition.

BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS

Available format(s)

Hardcopy , PDF

Language(s)

English

£20.00
Excluding VAT

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overall description of the IEC 61400-25 series
6 Wind power plant information model
7 Wind power plant information exchange model
8 Mapping to communication protocols

BS EN 61400-25-1 Ed.2.

Committee
45
DocumentType
Draft
Pages
34
PublisherName
British Standards Institution
Status
Current

IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
ISO/IEC 7498-1:1994 Information technology — Open Systems Interconnection — Basic Reference Model: The Basic Model
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

£20.00
Excluding VAT