12/30213833 DC : 0
|
BS ISO 16126 - SPACE SYSTEMS - ASSESSMENT OF SURVIVABILITY OF UNMANNED SPACECRAFT AGAINST SPACE DEBRIS AND METEOROID IMPACTS TO ENSURE SUCCESSFUL POST-MISSION DISPOSAL
|
15/30303532 DC : 0
|
BS ISO 17770 - SPACE SYSTEMS - CUBE SATELLITES (CUBESATS)
|
I.S. EN 16603-10:2018
|
SPACE ENGINEERING - SYSTEM ENGINEERING GENERAL REQUIREMENTS
|
BS ISO 17770:2017
|
Space systems. Cube satellites (CubeSats)
|
BS ISO 16127:2014
|
Space systems. Prevention of break-up of unmanned spacecraft
|
BS ISO 19683:2017
|
Space systems. Design qualification and acceptance tests of small spacecraft and units
|
ISO 16164:2015
|
Space systems — Disposal of satellites operating in or crossing Low Earth Orbit
|
BS ISO 27852:2016
|
Space systems. Estimation of orbit lifetime
|
PD ISO/TR 18146:2015
|
Space systems. Space debris mitigation design and operation guidelines for spacecraft
|
11/30237421 DC : 0
|
BS ISO 11227 - SPACE SYSTEMS - TEST PROCEDURE TO EVALUATE SPACECRAFT MATERIAL EJECTA UPON HYPERVELOCITY IMPACT
|
ISO 19683:2017
|
Space systems — Design qualification and acceptance tests of small spacecraft and units
|
I.S. EN 16601-00-01:2015
|
SPACE SYSTEMS - GLOSSARY OF TERMS
|
10/30197704 DC : 0
|
BS ISO 10784-2 - SPACE SYSTEMS - EARLY OPERATIONS - PART 2: INITIALIZATION PLAN
|
BS ISO 16699:2015
|
Space systems. Disposal of orbital launch stages
|
BS ISO 16126:2014
|
Space systems. Assessment of survivability of unmanned spacecraft against space debris and meteoroid impacts to ensure successful post-mission disposal
|
14/30213848 DC : 0
|
BS ISO 16164 - SPACE SYSTEMS - DISPOSAL OF SATELLITES OPERATING IN OR CROSSING LOW EARTH ORBIT
|
ISO 27852:2016
|
Space systems — Estimation of orbit lifetime
|
ISO 11227:2012
|
Space systems — Test procedure to evaluate spacecraft material ejecta upon hypervelocity impact
|
ISO 16699:2015
|
Space systems Disposal of orbital launch stages
|
ISO/TR 20590:2017
|
Space systems - Debris mitigation design and operation manual for launch vehicle orbital stages
|
BS ISO 11227:2012
|
Space systems. Test procedure to evaluate spacecraft material ejecta upon hypervelocity impact
|
BS ISO 23339:2010
|
Space systems. Unmanned spacecraft. Estimating the mass of remaining usable propellant
|
11/30204140 DC : 0
|
BS ISO 14200 - SPACE ENVIRONMENT (NATURAL AND ARTIFICIAL) - GUIDE TO PROCESS-BASED IMPLEMENTATION OF METEOROID AND DEBRIS ENVIRONMENTAL MODELS (ORBITAL ALTITUDES BELOW GEO + 2000 KM)
|
ISO 23339:2010
|
Space systems — Unmanned spacecraft — Estimating the mass of remaining usable propellant
|
BS ISO 26872:2010
|
Space systems. Disposal of satellites operating at geosynchronous altitude
|
EN 16603-10:2018
|
Space engineering - System engineering general requirements
|
ISO 14200:2012
|
Space environment (natural and artificial) Guide to process-based implementation of meteoroid and debris environmental models (orbital altitudes below GEO + 2 000 km)
|
12/30213836 DC : 0
|
BS ISO 16127 - SPACE SYSTEMS - PREVENTION OF BREAK-UP OF UNMANNED SPACECRAFT
|
BS EN 16601-00-01:2015
|
Space systems. Glossary of terms
|
13/30235933 DC : 0
|
BS ISO 16699 - SPACE SYSTEMS - DISPOSAL OF ORBITAL LAUNCH STAGES
|
BS ISO 16164:2015
|
Space systems. Disposal of satellites operating in or crossing Low Earth Orbit
|
BS ISO 14200:2012
|
Space environment (natural and artificial). Guide to process-based implementation of meteoroid and debris environmental models (orbital altitudes below GEO + 2 000 km)
|
BS ISO 10784-1:2011
|
Space systems. Early operations Spacecraft initialization and commissioning
|
ISO 26872:2010
|
Space systems Disposal of satellites operating at geosynchronous altitude
|
15/30324485 DC : 0
|
BS ISO 27852 - SPACE SYSTEMS - ESTIMATION OF ORBIT LIFETIME
|
BS ISO 27875 : 2010
|
SPACE SYSTEMS - RE-ENTRY RISK MANAGEMENT FOR UNMANNED SPACECRAFT AND LAUNCH VEHICLE ORBITAL STAGES
|
ISO 27875:2010
|
Space systems Re-entry risk management for unmanned spacecraft and launch vehicle orbital stages
|
ISO 16126:2014
|
Space systems — Assessment of survivability of unmanned spacecraft against space debris and meteoroid impacts to ensure successful post-mission disposal
|
ISO/TR 18146:2015
|
Space systems Space debris mitigation design and operation guidelines for spacecraft
|
BS ISO 17546:2016
|
Space systems. Lithium ion battery for space vehicles. Design and verification requirements
|
EN 16601-00-01:2015
|
Space systems - Glossary of terms
|
10/30197700 DC : 0
|
BS ISO 10784-1 - SPACE SYSTEMS - EARLY OPERATIONS - PART 1: SPACECRAFT INITIALIZATION AND COMMISSIONING
|
16/30302535 DC : 0
|
BS ISO 19683 - SPACE SYSTEMS - DESIGN QUALIFICATION AND ACCEPTANCE TESTS OF SMALL SPACECRAFT AND UNITS
|
PD ISO/TR 20590:2017
|
Space systems. Debris mitigation design and operation manual for launch vehicle orbital stages
|
ISO 16127:2014
|
Space systems — Prevention of break-up of unmanned spacecraft
|
ISO 17770:2017
|
Space systems — Cube satellites (CubeSats)
|
ISO 10784-1:2011
|
Space systems Early operations Part 1: Spacecraft initialization and commissioning
|
ISO 17546:2016
|
Space systems — Lithium ion battery for space vehicles — Design and verification requirements
|