• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

ADATP-11 VOL 1 : 2006

Current

Current

The latest, up-to-date edition.

STANDARD OPERATING PROCEDURES FOR NATO LINK 11 AND LINK 11B

Published date

01-01-2006

Publisher

NATO

Sorry this product is not available in your region.

VOLUME 1
CHAPTER 1 - GENERAL INFORMATION
Section:
1 Introduction.
2 Concept of Operations
3 System Description
CHAPTER 2 - OPERATIONAL PLANNING OF LINK 11/LINK 11B
            ARCHITECTURES
Section:
1 Considerations for Planning of Link 11/Link 11B
   Architectures
2 Allocation of Responsibilities and Duties
3 Link 11/Link 11B Modes of Operation
4 Participating Units and Reporting Units
5 Assignment of Track Numbers
6 Communication Requirements
7 Link Security
8 Automatic Correlation/Decorrelation
CHAPTER 3 - ESTABLISHMENT AND CONTROL OF A LINK 11 NET
Section:
1 Establishment of a Link 11 Net
2 Link 11 Specific Duties
3 Link 11 Net Modes
4 Procedures for Initiating a Link 11 Net
5 Procedures for Leaving and Terminating a Link 11 Net
6 Changing Link 11 Parameters
7 Link 11 Gridlock
8 Link 11 Communication Requirements
9 Link 11 Frequency Guide
10 Link 11 Security
11 UHF Link 11 Operations
12 Frequency Locking
13 Variable Track Quality
CHAPTER 4 - ESTABLISHMENT AND CONTROL OF LINK 11B
            ARCHITECTURES
Section:
1 Establishment of Link 11B Communications
2 Link 11B Specific Duties
3 Link 11B Modes/States
4 Preparing for Link 11B Operations
5 Procedures for Link 11B Initialisation/Reinitialisation
6 Terminating Link 11B Communications
7 Changing Link 11B Parameters
8 Link 11B Registration
9 Link 11B Communication Requirements
10 Link 11B Security
CHAPTER 5 - TRACK MANAGEMENT
Section:
1 Coordination
2 Control of Transmissions
3 Identities
4 Reporting Responsibilities
5 Correlation and Decorrelation
6 Information Differences
7 Changing Track Numbers
8 Cease Reporting
9 Dropping Tracks
10 NonReal-Time Tracks
11 Special Processing
12 Data Forwarding
13 Simulated Data
CHAPTER 6 - LINK MANAGEMENT CODES
Link Management Codes
CHAPTER 7 - LINK 11 TESTING
Section:
1 Data Terminal Test Requirements
2 Performance Operational Function Analysis (POFA)
3 Monitoring Link 11 Net Reliability
4 Conducting a Multi-Station POFA
CHAPTER 8 - COMMAND AND CONTROL FUNCTIONS
Section:
1 Link 11/Link 11B Functional Areas
2 Use of TEXT MESSAGE (M12.2.3/812.2.3)
3 Command and Control on Link 11/Link 11B
4 Weapons Coordination and Management
5 Air Control.
6 Theatre Missile Defence
7 Force Disposition and the Use of Link 11/Link 11B
8 Operation with Non-TDS Units
CHAPTER 9 - ELECTRONIC WARFARE COORDINATION AND CONTROL
Section:
1 General
2 EW Orders and Requests
3 EW Track Associations
4 ESM/ECM Intercept Reporting
CHAPTER 10 - ANTI-SUBMARINE WARFARE
TBD:
CHAPTER 11 - OPERATION OF LINK 11/LINK 11B IN A MULTI-LINK
             INTERFACE
Section:
1 Other Data Links
2 Examples of Complex Link Architectures
3 Operation of IJMS and Link 11/Link 11B Interface
4 Operation of Link 16 and Link 11/Link 11B Interface
ANNEXES
ANNEX A - Main Content of Individual Messages
Appendix 1 Main Content of Individual Messages
ANNEXB - Terms and Definitions
Appendix 1 - Codewords and Net Control Codewords
ANNEX C - Link 11 Checkout Procedures
Appendix
1 Checkout Procedure Data
2 Checkout Conduct Procedures
3 Checkout Procedure and Checkout Conduct Log
4 Mandatory and Optional Tests for Systems by Functional
   Areas
VOLUME 2
NATIONAL SUPPLEMENTS TO ALLIED DATA PROCESSING PUBLICATION 11(E)
NS 1 - Belgium
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 2 - Canada
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 3 - Denmark
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 4 - France
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 5 - Germany
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 6 - Greece
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 7 - Italy
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 8 - NATO E-3A
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 9 - Netherlands
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 10 - Norway
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 11 - Portugal
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 12 - SpainNS-SP-A-1
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 13 - Turkey
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 14 - United Kingdom
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 15 - United States
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility

Purpose of these Standard Operating Procedures (SOPs) is to give guidance to Operational Commanders, Tactical Commanders and to individual units, in the: a. Establishment, entry into, operation, alteration, exit from and termination of a data Link 11 net. b. Commencement, maintenance and termination of Link 11B communications. c. Establishment and operations of associated voice control circuits.

DocumentType
Standard
PublisherName
NATO
Status
Current

ADATP-33 : 2006 MULTI-LINK STANDARD OPERATING PROCEDURES FOR TACTICAL DATA SYSTEMS EMPLOYING LINK 16, LINK 11, LINK 11B, IJMS, LINK 1, LINK 4, AND ATDL-1
STANAG 5501 : 2006 DIGITAL DATA LINK - LINK 1 (POINT-TO-POINT)
STANAG 5511 : 2006 TACTICAL DATA EXCHANGE - LINK 11/LINK 11B
STANAG 5516 : 2006 TACTICAL DATA EXCHANGE - LINK 16
STANAG 1068 : 2013 THE ALLIED MARITIME ABOVE WATER WARFARE EXERCISE MANUAL

Sorry this product is not available in your region.