• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

ANS/ASME 58.22 - DRAFT 2014

Current

Current

The latest, up-to-date edition.

REQUIREMENTS FOR LOW POWER AND SHUTDOWN PROBABILISTIC RISK ASSESSMENT

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

25-03-2015

£306.09
Excluding VAT

Foreword
Preparation of Technical Inquiries To The Joint Committee On
Nuclear Risk Management
Committee Rosters
Part 1 - GENERAL REQUIREMENTS FOR AN LPSD PRA AND QLRA
Part 2 - PLANT OPERATING STATE ANALYSIS
Part 3 - REQUIREMENTS FOR INTERNAL EVENTS LPSD PRA
Part 4 - REQUIREMENTS FOR INTERNAL FLOODS FOR LPSD (LIF)
Part 5 - SEISMIC ANALYSIS
Part 6 - REQUIREMENTS FOR SCREENING
         AND CONSERVATIVE ANALYSIS OF
         OTHER EXTERNAL HAZARDS DURING
         LPSD CONDITIONS
Part 7 - HIGH WIND ANALYSIS
Part 8 - EXTERNAL FLOOD ANALYSIS
Part 9 - OTHER EXTERNAL HAZARDS ANALYSIS
Part 10 - LPSD QUANTATIVE RISK ASSESSMENT
          FOR A SPECIFIC LPSD Evolution
Part 11 - SHUTDOWN QUALITATIVE RISK
          ASSESSMENT
Part 12 - REFERENCES

Provides requirements for Low Power and Shutdown (LPSD) probabilistic risk assessments (PRA) and for LPSD Qualitative Risk Assessments (QLRA), both of which are used to support risk-informed decisions for commercial light water reactor nuclear power plants.

DevelopmentNote
Jointly published by ASME & ANS. (11/2017)
DocumentType
Draft
Pages
299
ProductNote
This product is unavailable in Ukraine, Russia, Belarus
PublisherName
American Nuclear Society
Status
Current

ASME RA-S : 2008 LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS

£306.09
Excluding VAT