API 580 : 2016
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
RISK-BASED INSPECTION
English
01-02-2016
02-09-2023
1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, and Abbreviations
4 Basic Risk Assessment Concepts
5 Introduction to Risk-Based Inspection
6 Planning the RBI Assessment
7 Data and Information Collection for RBI Assessment
8 Damage Mechanisms and Failure Modes
9 Assessing Probability of Failure
10 Assessing Consequence of Failure
11 Risk Determination, Assessment, and Management
12 Risk Management with Inspection Activities
13 Other Risk Mitigation Activities
14 Reassessment and Updating RBI Assessments
15 Roles, Responsibilities, Training, and Qualifications
16 RBI Documentation and Recordkeeping
17 Summary of Risk-Based Inspection Pitfalls
Bibliography
Gives users with the basic minimum and recommended elements for developing, implementing, and maintaining a risk-based inspection (RBI) program.
| DevelopmentNote |
Chinese translation of 2ED 2009 edition is still available, see API 580 CHINESE. (02/2016)
|
| DocumentType |
Standard
|
| Pages |
94
|
| ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
| PublisherName |
American Petroleum Institute
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |