AS 2676.2-1992
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Guide to the installation, maintenance, testing and replacement of secondary batteries in buildings - Sealed cells
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
01-01-1992
17-04-2020
Part 2 sets out recommended practices for the installation, maintenance, testing and replacement of sealed secondary batteries permanently installed in buildings.
| Committee |
EL-005
|
| DocumentType |
Standard
|
| ISBN |
0 7262 7302 3
|
| Pages |
28
|
| PublisherName |
Standards Australia
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
This Standard sets out recommended practices for the installation, maintenance, testing and replacement of sealed secondary batteries (either valve-regulated or gastight) located in or on buildings. It also provides guidance to determine when batteries should be replaced.This Standard covers secondary batteries with a nominal voltage of 24 V or greater, and a capacity exceeding 10 A.h at the 1 h rate and includes batteries comprising lead-acid cells and alkaline cells (such as nickel-cadmium cells).This Standard covers requirements for components of the d.c. system of which the battery is a part, wherethese components comprise an essential part of the d.c. system.This Standard covers sealed cells only. The installation and maintenance of vented cells are covered byAS 3011.1 and AS 2676.1.NOTE: Requirements specifically applicable to the design and installation of extra-low voltage (d.c.) power supplies that are used by telecommunications carriers in the provision of public telecommunications networks are given in AS 3015 (Int)-1991, Electrical installations- Extra-low voltage (d.c.) power supplies in public telecommunications networks.
First published as AS 2676.2-1992.