1 - AS/NZS 3788:2001 PRESSURE EQUIPMENT-IN-SERVICE INSPECTION
4 - PREFACE
5 - CONTENTS
7 - SECTION 1 SCOPE AND GENERAL
7 - 1.1 SCOPE
7 - 1.2 APPLICATION
9 - 1.3 REFERENCED AND RELATED DOCUMENTS
9 - 1.3.1 Referenced documents
9 - 1.3.2 Related documents
9 - 1.4 DEFINITIONS
9 - 1.4.1 Pressure equipment and ancillaries
9 - 1.5 RISK MANAGEMENT AND RISK BASED INSPECTION
9 - 1.6 SAFETY
9 - 1.7 METHODS OF INSPECTION
10 - 1.8 SPECIAL CONDITIONS AND VARIATIONS
10 - 1.9 ALTERNATIVE STANDARDS
11 - SECTION 2 BASIC FEATURES OF INSPECTION
11 - 2.1 OBJECTIVES OF INSPECTION
11 - 2.2 ELEMENTS OF INSPECTION
11 - 2.3 STAGES OF INSPECTION
12 - 2.4 INSPECTION PROCESS
14 - SECTION 3 INSPECTION PERSONNEL AND ADMINISTRATION
14 - 3.1 OWNERS RESPONSIBILITIES
14 - 3.2 IN-SERVICE INSPECTORS RESPONSIBILITIES AND CAPABILITIES
14 - 3.2.1 General
15 - 3.2.2 Particular responsibilities
15 - 3.3 OWNER INSPECTION SYSTEM
15 - 3.3.1 Requirements
16 - 3.4 SUPPORT ORGANIZATIONS
17 - SECTION 4 PRESSURE EQUIPMENT INSPECTION
17 - 4.1 GENERAL
17 - 4.2 COMMISSIONING OR RECOMMISSIONING INSPECTION
17 - 4.3 OPERATING SURVEILLANCE
18 - 4.4 PERIODIC INSPECTION (See Notes to Clause 4.4.4)
18 - 4.4.1 General
18 - 4.4.2 First in-service inspection
18 - 4.4.3 Guidelines for the periodic inspection of pressure equipment
18 - 4.4.4 Frequency of periodic inspection
28 - 4.5 INSPECTION OF IDLE PRESSURE EQUIPMENT
29 - 4.6 PRESSURE-RELIEF DEVICES
29 - 4.6.1 General
29 - 4.6.2 Installation
29 - 4.6.3 Security of operation
29 - 4.6.4 In-service visual inspection
29 - 4.6.5 Valve maintenance or repairs
30 - 4.6.6 Spring-loaded, pilot-operated and deadweight pressure-relief valves
31 - 4.6.7 Bursting discs
31 - 4.6.8 Rupture pin valves (Buckling pin non-reclosing pressure relief device)
32 - 4.6.9 Fusible plugs
32 - 4.7 CONTROLS CRITICAL FOR SAFEGUARDING EQUIPMENT
32 - 4.7.1 Pressure-actuated devices
32 - 4.7.2 Temperature-actuated devices
32 - 4.7.3 Excess flow and back check valves
32 - 4.7.4 Quick-actuating closure interlocks and swing bolt doors
32 - 4.7.5 Relief valve isolation interlocks
32 - 4.8 INSTRUMENTATION AND CONTROLS
32 - 4.9 EMERGENCY SHUTDOWN SYSTEMS
33 - 4.10 AUTOMATIC FIREFIGHTING SYSTEMS USED TO PROTECT PRESSURE EQUIPMENT
33 - 4.11 LOW TEMPERATURE VESSELS
33 - 4.11.1 Vacuum-insulated vessels
33 - 4.11.2 Insulated, non-vacuum, non-jacketed vessels
33 - 4.11.3 Transportable vessels
34 - SECTION 5 ASSESSMENT OF PRESSURE EQUIPMENT INTEGRITY
34 - 5.1 GENERAL
34 - 5.1.1 Scope of section
34 - 5.1.2 Responsibility
34 - 5.1.3 Documentation
34 - 5.2 ACCEPTANCE CRITERIA OF DEFECTS
34 - 5.2.1 Introduction
35 - 5.2.2 Initial review
35 - 5.2.3 Investigation of defects
36 - 5.2.4 Thinning of walls
36 - 5.2.5 Cracking
37 - 5.2.6 Planar type weld defects
37 - 5.2.7 Volume type weld defects
37 - 5.2.8 Dents
38 - 5.2.9 Metallurgically damaged material
38 - 5.2.10 Leakage
38 - 5.2.11 Bulging
38 - 5.3 DETERMINATION OF REMAINING LIFE
38 - 5.3.1 General
39 - 5.3.2 Investigation Method
40 - 5.3.3 Fatigue
40 - 5.3.4 Creep
41 - 5.3.5 Combined creep and fatigue
41 - 5.3.6 Wastage
41 - 5.3.7 Combined creep, fatigue and wastage
41 - 5.3.8 Review of design life of pressure equipment of advanced design and construction
42 - 5.3.9 Inspection prior to end of remaining life
42 - 5.4 DETERMINATION OF MAXIMUM ALLOWABLE WORKING PRESSURE
42 - 5.4.1 Introduction
42 - 5.4.2 Presence of defects
43 - 5.4.3 Changed operating conditions
43 - 5.5 RELATED DOCUMENTS
44 - SECTION 6 REPAIRS, ALTERATIONS AND RE-RATING
44 - 6.1 GENERAL
44 - 6.2 REPAIRS, REPLACEMENTS AND ALTERATIONS
44 - 6.2.1 Procedure and design
44 - 6.2.2 Minor repairs
45 - 6.2.3 Welder qualifications
45 - 6.2.4 Inspection
45 - 6.3 RE-RATING
46 - SECTION 7 INVESTIGATION OF DETERIORATION AND FAILURES
46 - 7.1 GENERAL
46 - 7.2 FAILURE ANALYSIS
46 - 7.2.1 General
46 - 7.2.2 Failure analysis data
47 - 7.3 RECORDING OF INCIDENTS AND FAILURES
52 - SECTION 8 PRESSURE EQUIPMENT IDENTIFICATION AND REGISTRATION DOCUMENTATION AND RECORDS
52 - 8.1 GENERAL
52 - 8.2 PRESSURE EQUIPMENT REGISTER
52 - 8.3 PRESSURE EQUIPMENT DATA
53 - 8.4 PRESSURE EQUIPMENT HISTORY
53 - 8.5 PRESSURE PIPING
54 - APPENDIX A - LIST OF REFERENCED DOCUMENTS
58 - APPENDIX B - RISK MANAGEMENT
58 - B1 GENERAL
58 - B2 RISK ANALYSIS AND MANAGEMENT TECHNIQUES
58 - B2.1 Hazard survey
58 - B2.2 Hazard and operability study
58 - B2.3 Reliability study
58 - B2.4 System reliability and fault tree analysis
59 - B2.5 Consequence analysis
59 - B2.6 Risk assessment
59 - B3 AUDITS
59 - B4 USE OF RISK MANAGEMENT
59 - B5 RISK BASED INSPECTION
61 - APPENDIX C - SAFETY DURING INSPECTION
61 - C1 GENERAL
61 - C2 HAZARDOUS SUBSTANCES
61 - C3 INSPECTION EQUIPMENT
62 - C4 SAFETY AND PROTECTIVE EQUIPMENT
62 - C5 ISOLATION AND TAGGING
64 - APPENDIX D - METHODS OF INSPECTION
64 - D1 SCOPE
64 - D2 METHODS
64 - D3 DOCUMENTATION
64 - D4 SURFACE PREPARATION
64 - D5 COMPETENCE
64 - D6 VISUAL EXAMINATION
64 - D6.1 General
65 - D6.2 External visual examination
65 - D6.3 Internal visual examination
66 - D7 THICKNESS TESTING
66 - D8 RADIOGRAPHIC EXAMINATION
67 - D9 ULTRASONIC EXAMINATION
67 - D10 MAGNETIC PARTICLE EXAMINATION
67 - D11 PENETRANT EXAMINATION
67 - D12 INFRARED THERMOGRAPHY
67 - D13 OTHER NON-DESTRUCTIVE EXAMINATION METHODS
67 - D14 METALLURGICAL TESTING
67 - D14.1 Material identification
68 - D14.2 Hardness
68 - D14.3 Microscopy and replication
68 - D15 HYDROSTATIC PRESSURE TEST
68 - D15.1 General
69 - D15.2 Test pressure
69 - D15.3 Test medium
69 - D15.4 Test temperature
69 - D15.5 Hydrostatic test procedure
70 - D15.6 Reporting of results
71 - D16 PNEUMATIC PRESSURE TEST
71 - D16.1 Application
71 - D16.2 General precautions
72 - D16.3 Examination of welds
72 - D16.4 Test temperature
73 - D16.5 Test pressure
73 - D16.6 Test procedure
73 - D16.7 Reporting of results
74 - D17 COMBINED HYDROSTATIC/PNEUMATIC TEST
74 - D18 LEAK TESTING
74 - D18.1 General
74 - D18.2 Pneumatic leak testing of low temperature vessels
74 - D19 DESTRUCTIVE TESTING
75 - D20 INSPECTION OF INTERNAL LININGS
76 - APPENDIX E - INSPECTION AND REPAIR OF TRANSPORTABLE VESSELS
76 - E1 GENERAL
77 - E2 MATERIALS OF CONSTRUCTION
77 - E3 INSPECTION
77 - E3.1 Inspection frequency
77 - E3.2 Visual examination
79 - E3.3 Non-destructive examination
81 - E3.4 Ancillary equipment
82 - E4 REPAIRS, ALTERATION AND RERATING OF TRANSPORTABLE VESSELS
82 - E4.1 General
82 - E4.2 Repairs
83 - E4.3 Non-destructive examination
83 - E4.4 Repair after accident
83 - E4.5 Postweld heat treatment
84 - APPENDIX F - INSPECTION OF BOILERS
84 - F1 PRE-SHUTDOWN INSPECTION
84 - F2 SHUTDOWN PROCEDURE
84 - F3 PREPARATION FOR SHUTDOWN INSPECTION
85 - F4 SHUTDOWN INSPECTION
86 - F5 INSPECTION OF BOILER MANAGEMENT SYSTEMS
86 - F6 INSPECTION DURING RECOMMISSIONING
86 - F7 BOILER ANCILLARY EQUIPMENT
86 - F8 REPORT
87 - APPENDIX G - INSPECTION OF UNFIRED PRESSURE VESSELS-STATIONARY
87 - G1 GENERAL
87 - G2 AIR RECEIVERS
87 - G3 PRESSURIZED STORAGE VESSELS
87 - G4 LP GAS STORAGE VESSELS
88 - G5 PROCESS VESSELS
88 - G6 AUXILIARY VESSELS
88 - G7 AUTOCLAVES
88 - G8 REPORT
89 - APPENDIX H - INSPECTION OF HEAT EXCHANGERS, COOLERS AND CONDENSERS
89 - H1 GENERAL
89 - H2 SHELL AND TUBE HEAT EXCHANGERS
90 - H3 AIR-COOLED HEAT EXCHANGERS
90 - H4 PLATE HEAT EXCHANGERS
91 - APPENDIX I - INSPECTION OF PRESSURE PIPING
91 - I1 GENERAL
91 - I2 PIPING OF HAZARD LEVELS A AND B
92 - I3 POSSIBLE MODES AND CAUSES OF FAILURE
92 - I4 INSPECTION PERIODS
92 - I5 DATA AND HISTORY RECORDS
92 - I5.1 Data
93 - I5.2 History records
93 - I6 INSPECTION
93 - I6.1 General external visual inspection
95 - I6.2 Inspection during operation and shutdown
96 - I6.3 Inspection during outage and start-up
96 - I7 NON-DESTRUCTIVE EXAMINATION
98 - I8 THE EFFECTS OF CREEP AND THERMAL FATIGUE ON PIPING
98 - I8.1 Creep
99 - I8.2 Thermal fatigue
99 - I8.3 Combined creep and thermal fatigue
100 - I9 BURIED PIPING
101 - APPENDIX J - INSPECTION OF FIRED HEATERS
101 - J1 GENERAL
101 - J2 INSPECTION OF PRESSURE COMPONENTS
102 - J3 INSPECTION OF FIRESIDE COMPONENTS
102 - J4 EXTERNAL INSPECTION
103 - J5 TESTING
104 - APPENDIX K - TYPICAL INSPECTION REPORTS IN ACCORDANCE WITH THIS STANDARD
106 - APPENDIX L - PRESERVATION AND INSPECTION OF IDLE PRESSURE EQUIPMENT
106 - L1 GENERAL
106 - L2 DECOMMISSIONING
106 - L3 EXTERNAL INSPECTION
106 - L4 PRESERVATION PROCEDURE
107 - L5 MONITORING OF PRESSURE EQUIPMENT STANDING IDLE
107 - L6 RECOMMISSIONING
108 - APPENDIX M - COMMON MODES AND CAUSES OF DETERIORATION AND FAILURE
108 - M1 GENERAL
108 - M2 CORROSION
108 - M2.1 Groups of corrosion
108 - M2.2 Forms of corrosion
110 - M3 HYDROGEN BLISTERING
110 - M4 HYDROGEN SULPHIDE CRACKING
110 - M5 FATIGUE
111 - M6 DISTORTION BY OVERHEATING
111 - M7 CREEP
111 - M8 BRITTLE FRACTURE
111 - M9 LIQUID METAL EMBRITTLEMENT
111 - M10 OVERPRESSURIZATION
111 - M11 OVERLOADING
112 - M12 EARTHQUAKES, EARTH SETTLEMENT AND WIND LOADING
112 - M13 MECHANICAL DAMAGE
112 - M14 EROSION
112 - M14.1 Internal
112 - M14.2 External
116 - APPENDIX N - ASSESSMENT OF LOCALIZED WALL THINNING OF CYLINDRICAL, CONICAL, AND SPHERICAL SHELLS
116 - N1 GENERAL
116 - N2 NOTATION
117 - N3 ASSESSMENT PROCEDURE
117 - N3.1 Method
117 - N3.2 Definition of thinned area
118 - N3.3 Minimum calculated thickness
118 - N3.4 Characteristic shell length (Ls)
119 - N3.5 Mean thickness of trapezoidal patches
119 - N3.6 Acceptability of thinning
120 - N4 ALLOWABLE MINIMUM THICKNESS
120 - N5 TREATMENT OF THINNED AREAS
120 - N6 EXAMPLE OF ASSESSMENT OF LOCALLY THINNED WALL
120 - N6.1 Problem
121 - N7 Example with no weld in thinned area
122 - N7.1 Example with weld in thinned area
125 - N7.2 Example of Dm for corroded area within a vessel
126 - APPENDIX O - ASSESSMENT OF PLANAR DEFECTS
126 - O1 GENERAL
126 - O2 NOTATION
127 - O3 CRITICAL CRACK SIZE (ac)
131 - O4 CRACK GROWTH DUE TO FATIGUE
132 - O5 SAFETY FACTORS
132 - O6 FURTHER CONSIDERATIONS
132 - O7 EXAMPLES OF APPLICATION OF SIMPLIFIED FRACTURE MECHANICS FOR ASSESSING CRACK-LIKE DEFECTS
132 - O7.1 Definition of problem
133 - O7.2 Calculation of critical crack size
139 - APPENDIX P - TYPICAL MAINTENANCE REPORT-PRESSURE-RELIEF VALVES
140 - APPENDIX Q - INSPECTION OF PRESSURE EQUIPMENT WITH QUICK-ACTUATING CLOSURES AND SWING BOLT DOORS
140 - Q1 INSPECTION
140 - Q2 RECORDS
141 - APPENDIX R - EXTERNAL INSPECTION OF BURIED OR MOUNDED PRESSURE VESSELS
141 - R1 EXTERNAL INSPECTION OF PRESSURE VESSELS WITHOUT CATHODIC PROTECTION
141 - R2 EXTERNAL INSPECTION OF PRESSURE VESSELS WITH CATHODIC PROTECTION
141 - R3 RECORDS
142 - APPENDIX S - INSPECTION OF DEAERATORS
142 - S1 GENERAL
142 - S2 INSPECTION AND REPAIR
143 - S3 RELATED DOCUMENT
144 - APPENDIX T - INSPECTION OF STORAGE TANKS TO ANSI/API 620 OR EQUIVALENT
144 - T1 SCOPE
144 - T2 AMBIENT TEMPERATURE AND HEATED TANKS
144 - T3 LOW TEMPERATURE STORAGE TANKS (tanks normally operating below -10°C)
144 - T3.1 Internal inspection of low temperature storage tanks
145 - T3.2 External inspection of low temperature storage tanks
146 - T4 RELATED DOCUMENTS
147 - APPENDIX U - COST EFFECTIVE REMAINING LIFE ASSESSMENT
147 - U1 BACKGROUND
147 - U2 FACTORS AFFECTING REMAINING LIFE
147 - U3 THREE STAGE REMAINING LIFE ASSESSMENT
149 - U4 WORKED EXAMPLE OF A THREE-STAGE REMAINING LIFE ASSESSMENT
153 - APPENDIX V - KEY COMPETENCIES FOR IN-SERVICE INSPECTORS
154 - APPENDIX W - INSPECTION OF DRUMS FOR TRANSPORT OF LIQUEFIED GAS
154 - W1 APPLICATION
154 - W2 PERIODIC INSPECTION AND TESTING
154 - W3 EXTERNAL EXAMINATION
154 - W3.1 General
154 - W3.2 Bulge
154 - W3.3 Burn
155 - W3.4 Dents
155 - W3.5 Cuts and gouges
155 - W3.6 Isolated pits
156 - W3.7 Chain pitting and line corrosion
156 - W3.8 General corrosion
157 - W3.9 Gas leakage
157 - W3.10 Fire damage
157 - W4 INTERNAL EXAMINATION
158 - W5 CLEANING
158 - W6 WEIGHING
158 - W7 MARKING
158 - W8 RECORDING
158 - W9 PLUGS AND VALVES
159 - APPENDIX X - TESTING OF SOFT SEATED POP ACTION RELIEF VALVES FOR LIQUEFIABLE GAS SERVICE
159 - X1 GENERAL
159 - X2 PRESSURE GAUGES
159 - X3 TEST PROCEDURE
159 - X4 PASS/FAIL CRITERIA
160 - APPENDIX Y - IN-SERVICE INSPECTION AND RECORD KEEPING FOR STEAM LOCOMOTIVE, TRACTION ENGINE AND PORTABLE STEAM ENGINE .....
160 - Y1 GENERAL
160 - Y2 ORGANIZATION AND PERSONNEL
160 - Y3 RESPONSIBILITIES
160 - Y4 IN-SERVICE INSPECTION
160 - Y4.1 Trip inspections
160 - Y4.2 Washout requirements and water treatment
161 - Y4.3 Interim inspections
161 - Y4.4 Annual inspection
161 - Y4.5 Full internal inspection
161 - Y4.6 Hydrostatic testing
162 - Y4.7 Boilers in long-term storage
162 - Y4.8 Cracking of asymmetrical seams and the need for test grooves
163 - Y5 RECORDS
163 - Y6 LOGBOOK AND INSPECTION RECORDS