• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ASHRAE GUIDELINE 5 : 1994

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

COMMISSIONING SMOKE MANAGEMENT SYSTEMS

Published date

01-01-2001

Superseded date

25-03-2023

Sorry this product is not available in your region.

1 Purpose
2 Scope
3 Recommissioning
4 Definitions
5 Pre-Design Phase
6 Design Phase
7 Construction Phase
8 Acceptance Procedures
9 Post-Acceptance Phase
10 References
Appendix A System Information Required
Appendix B Smoke Management System (SMS) Commissioning Process
             Phases
Appendix C Sample Report Forms

Defines methods for verifying and documenting that the performance of smoke management systems conforms with design intent. Covers all types of smoke management systems; documentation of occupancy and use requirements and system design assumptions; documentation of design intent, system description and operation; functional performance testing and documentation necessary for evaluating system acceptance.

DocumentType
Standard
ProductNote
Reconfirmed 1994
PublisherName
American Society of Heating, Refrigerating & Air Conditioning Engineers
Status
Superseded
SupersededBy

Sorry this product is not available in your region.