• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BIS IS 15663-3 : 2006(R2011)

Current

Current

The latest, up-to-date edition.

DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 3: PRE-COMMISSIONING AND COMMISSIONING OF PIPELINES

Published date

12-01-2013

Sorry this product is not available in your region.

FOREWORD
1 SCOPE
2 REFERENCE
3 TERMINOLOGY
4 GENERAL
5 PRE-COMMISSIONING
6 COMMISSIONING
7 DOCUMENTATION

Provides the minimum requirements for pre-commissioning and commissioning of natural gas pipeline, including pre-commissioning activities such as pre-commissioning checks, flushing, dewatering, swabbing, magnetic cleaning/electronic geometry pigging (EGP), drying, inertisation, gas-in and commissioning, stabilization and 72 h run.

Committee
CED 7
DocumentType
Standard
PublisherName
Bureau of Indian Standards
Status
Current

BIS IS 15663-1 : 2006(R2011) DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 1: LAYING OF PIPELINES

BIS IS 15663-1 : 2006(R2011) DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 1: LAYING OF PIPELINES

Sorry this product is not available in your region.