• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS EN 50342-1:2015+A2:2021

Current

Current

The latest, up-to-date edition.

Lead-acid starter batteries General requirements and methods of test

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

11-03-2022

£232.00
Excluding VAT

Committee
PEL/21
DocumentType
Standard
Pages
30
PublisherName
British Standards Institution
Status
Current
Supersedes

TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018 - Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document. - Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Standards Relationship
EN 50342-1:2015/A2:2021 Identical

£232.00
Excluding VAT