• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

CGA P 8.9 : 2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BULK LIQUID OXYGEN, NITROGEN, AND ARGON STORAGE SYSTEMS AT PRODUCTION SITES

Published date

07-11-2013

Superseded date

20-07-2023

Superseded by

CGA P-8.9:2023

Sorry this product is not available in your region.

1 Introduction
2 Scope
3 Definitions
4 General hazards
5 Storage tank system design considerations
6 Storage tank fabrication
7 Site selection and layout of installation
8 Testing and commissioning
9 Operation and maintenance
10 Training and protection of personnel
11 References
Annexes
Appendix A - Specific requirements for cluster storage
             tanks
Appendix B - Specific requirements for vacuum-insulated
             storage tanks (VIT)

Provides guidance of those persons directly associated with the design, installation, operation, and maintenance of bulk cryogenic liquid storage systems.

DevelopmentNote
Supersedes CGA P 25. (07/2014)
DocumentType
Standard
PublisherName
Compressed Gas Association
Status
Superseded
SupersededBy
Supersedes

CGA G 4.7 : 2014 INSTALLATION GUIDE FOR STATIONARY, ELECTRIC-MOTOR-DRIVEN, CENTRIFUGAL LIQUID OXYGEN PUMPS
CGA P 40 : 2017 CALCULATION METHOD FOR THE ANALYSIS AND PREVENTION OF OVERPRESSURE DURING REFILLING OF CRYOGENIC TANKS WITH RUPTURE DISK(S)
CGA P 64 : 2014 GUIDELINE FOR THE LOCATION OF OCCUPIED BUILDINGS IN INDUSTRIAL GAS PLANTS

CGA G 11.1 : 2016 COMMODITY SPECIFICATION FOR ARGON
CGA P 18 : 2013 STANDARD FOR BULK INERT GAS SYSTEMS
CGA G 4.7 : 2014 INSTALLATION GUIDE FOR STATIONARY, ELECTRIC-MOTOR-DRIVEN, CENTRIFUGAL LIQUID OXYGEN PUMPS
CGA SB 15 : 2009 MANAGING HAZARDS IN CONFINED WORK SPACES DURING MAINTENANCE, CONSTRUCTION, AND SIMILAR ACTIVITIES
CGA P 40 : 2017 CALCULATION METHOD FOR THE ANALYSIS AND PREVENTION OF OVERPRESSURE DURING REFILLING OF CRYOGENIC TANKS WITH RUPTURE DISK(S)
CGA P 12 : 2017 SAFE HANDLING OF CRYOGENIC LIQUIDS
CGA G 10.1 : 2016 COMMODITY SPECIFICATION FOR NITROGEN
CGA G 4.1 : 2009 CLEANING EQUIPMENT FOR OXYGEN SERVICE
CGA S 1.3 : 2008 PRESSURE RELIEF DEVICE STANDARDS - PART 3: STATIONARY STORAGE CONTAINERS FOR COMPRESSED GASES
CGA P 31 : 2012 LIQUID OXYGEN, NITROGEN, AND ARGON CRYOGENIC TANKER LOADING SYSTEMS

Sorry this product is not available in your region.