• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DD IEC TS 61400-26-1 : 2011

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

WIND TURBINES - PART 26-1: TIME-BASED AVAILABILITY FOR WIND TURBINE GENERATING SYSTEMS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2011

Superseded date

31-10-2017

£260.00
Excluding VAT

FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
5 INFORMATION AVAILABLE
6 INFORMATION UNAVAILABLE
Annex A (informative) - Optional information
        categories - examples
Annex B (informative) - Time based availability
        indicators - examples
Annex C (informative) - Verification scenarios - examples
Bibliography

Describes generic information categories to which fractions of time can be assigned for a wind turbine generating system (WTGS) considering internal and external conditions based on fraction of time.

Committee
PEL/88
DevelopmentNote
Renumbered and Superseded by BS PD CLC/TS 61400-26-1. (11/2017)
DocumentType
Draft
Pages
58
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

Standards Relationship
IEC TS 61400-26-1:2011 Identical

IEC 60050-415:1999 International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems
IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
ISO 3977-9:1999 Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements

£260.00
Excluding VAT