• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

DD IEC TS 62257-9-1 : DRAFT 2008

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

RECOMMENDATIONS FOR SMALL RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION - PART 9-1: MICROPOWER SYSTEMS

Published date

23-11-2012

Superseded date

31-10-2016

Superseded by

PD IEC/TS 62257-9-1:2016

Sorry this product is not available in your region.
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 General
   4.1 Boundary of a micropower plant
   4.2 Composition of a micropower plant
   4.3 General functional layout of a micropower plant
5 Design
   5.1 Design criteria
   5.2 Power generation mix
        5.2.1 General
        5.2.2 Internal combustion generator sets
   5.3 Electrical design
        5.3.1 System voltage selection
        5.3.2 Interconnection of generators
   5.4 Mechanical and civil works
        5.4.1 Civil works
        5.4.2 Technical room
        5.4.3 Battery room
        5.4.4 Specific requirements
6 Safety issues
   6.1 Electrical issues
        6.1.1 General
        6.1.2 Specific requirements
   6.2 Mechanical issues
   6.3 Thermal and fire issues
   6.4 Noise issues
   6.5 Access security
7 Erection of equipment
   7.1 Siting
        7.1.1 Photovoltaic array
        7.1.2 Wind turbine
        7.1.3 Micro-hydro turbine
        7.1.4 Generator set
        7.1.5 Technical room
   7.2 Equipment installation
        7.2.1 Mechanical
        7.2.2 Electrical
8 Acceptance process
   8.1 General
   8.2 Phase 1: Preparation
   8.3 Phase 2: Documentation
   8.4 Phase 3: Commissioning
        8.4.1 Step 1: Evaluation of the conformity of the
               installed system with the accepted design
        8.4.2 Step 2: Evaluation of qualification of the
               installation
        8.4.3 Step 3: Preliminary tests
        8.4.4 Step 4: Performance testing
   8.5 Phase 4: Agreement
   8.6 Commissioning records
9 Operation, maintenance and replacement
10 Marking and documentation
   10.1 Marking
        10.1.1 Information for emergency services
        10.1.2 Information for maintenance
        10.1.3 Information for batteries
        10.1.4 Information for sockets
        10.1.5 Signs
   10.2 Documentation
Annex A (informative) - Selectivity of protection
Annex B (informative) - Risk assessment of lightning stroke
Annex C (normative) - Voltage domains
Annex D (informative) - Battery room
Annex E (informative) - Energy fraction calculations
Annex F (informative) - Noise control
Annex G (informative) - Commissioning record sheet (examples)
Bibliography

Pertains to a micropower plant which is the electric energy generation subsystem associated with a decentralized rural electrification system.

Committee
GEL/82
DevelopmentNote
Supersedes 07/30168230 DC. (03/2009)
DocumentType
Draft
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Sorry this product is not available in your region.