• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 00-40(PT4)/1(1991) : 1991

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

RELIABILITY AND MAINTAINABILITY - PART 4: GUIDANCE FOR WRITING NATO R & M REQUIREMENTS DOCUMENTS

Available format(s)

PDF

Language(s)

English

Published date

01-01-1991

Superseded date

13-06-2003

£13.60
Excluding VAT

Preface
0 Introduction
1 Scope
2 Related Documents
3 Definitions
4 Application
Appendix A Allied Reliability Maintainability Publication
           (ARMP)-4
Chapter 1 Introduction
Chapter 2 Concepts and Factors
Chapter 3 Development of the R&M Content of the PAPS Milestones

Applies to all materiel developed for use by NATO. It complements Defstan 00-40 (Part1) (ARMP-1) and Defstan 00-40 (Part 2) (ARMP-2) by providing guidance for writing R&M requirements documents.

DocumentType
Standard
Pages
44
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy

DEFSTAN 00-60(PT2)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR
DEFSTAN 00-60(PT20)/6(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES
DEFSTAN 00-60(PT22)/4(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION
DEFSTAN 00-60(PT3)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 00-60(PT21)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING
DEFSTAN 00-60(PT25)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING
DEFSTAN 00-60(PT23)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING
DEFSTAN 00-60(PT1)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
DEFSTAN 00-25(PT14)/1(2000) : 2000 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN
DEFSTAN 02-339/2(2002) : INTERIM REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
DEFSTAN 02-339/3(2006) : 2006 REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
DEFSTAN 00-60(PT24)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION
DEFSTAN 00-43(PT2)/1(1995) : 1995 RELIABILITY AND MAINTAINABILITY ASSURANCE ACTIVITY - PART 2: MAINTAINABILITY DEMONSTRATIONS
DEFSTAN 00-60(PT22)/5(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PART 22: PROCEDURES FOR CODIFICATION
DEFSTAN 00-60(PT26)/1(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 26: PROCEDURES FOR REPAIR ADMINISTRATION

ARMP-3 : 1998 LIST AND SOURCE OF NATIONAL AND INTERNATIONAL R&M DOCUMENTS
DEFSTAN 00-40(PT2)/2(1994) : 1994 RELIABILITY AND MAINTAINABILITY - PART 2: GENERAL APPLICATION GUIDANCE ON THE USE OF PART 1
ARMP-5 : 1998 GUIDANCE ON RELIABILITY AND MAINTAINABILITY TRAINING
DEFSTAN 00-40(PT1)/2(1987) : 1987 RELIABILITY AND MAINTAINABILITY - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS
ARMP-8 : 1991 RELIABILITY & MAINTAINABILITY (R&M) IN THE PROCUREMENT OF OFF-THE-SHELF (OTS) EQUIPMENT
STANAG 4174 : 2008 ALLIED RELIABILITY AND MAINTAINABILITY PUBLICATIONS
ARMP-6 : 2008 GUIDANCE FOR MANAGING IN-SERVICE R&M
ARMP-1 : 2008 NATO REQUIREMENTS FOR RELIABILITY AND MAINTAINABILITY
ARMP-2 : 1993 GENERAL APPLICATION GUIDANCE ON THE USE OF ARMP-1

£13.60
Excluding VAT