• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

EN ISO 18365:2013

Current

Current

The latest, up-to-date edition.

Hydrometry - Selection, establishment and operation of a gauging station (ISO 18365:2013)

Published date

04-12-2013

Sorry this product is not available in your region.
Summarise this standard

Foreword
1 Scope
2 Normative references
3 Terms, definitions and symbols
4 General requirements and considerations
5 Water level (Stage) only gauging stations
6 Stage-discharge gauging stations
7 Stage- discharge gauging stations using
   hydraulic structures
8 Velocity-discharge gauging stations
9 Measurement under difficult conditions
10 Operation and maintenance
Annex A (informative) - Applicable conditions for
        selection of discharge measurement method
Bibliography

ISO 18365:2013 gives requirements for the establishment and operation of a gauging station for the measurement of stage, or stage and discharge, of a lake, reservoir, river or canal or other artificial open channel. It also describes how a gauging station utilising one of the measurement methods listed should be operated and maintained.Requirements are provided for stage only measurement stations, stage-discharge stations and direct-discharge measurement stations in natural channels, as well as for stage-discharge stations with artificial structures. Additionally, some requirements are given for measurements under difficult conditions, such as under ice conditions.

Committee
CEN/TC 318
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current

Sorry this product is not available in your region.