ENA ER P26 : ISSUE 1 1985
Current
The latest, up-to-date edition.
THE ESTIMATION OF THE MAXIMUM PROSPECTIVE SHORT-CIRCUIT CURRENT FOR THREE PHASE 415 V SUPPLIES
12-01-2013
1 INTRODUCTION
2 SERVICE LINE ARRANGEMENTS
3 THE PROSPECTIVE SHORT-CIRCUIT
LEVEL ON THE BOARD'S MAIN DISTRIBUTOR
4 ESTIMATION OF THE PROSPECTIVE
SHORT-CIRCUIT CURRENT AT
THE BOARD'S CUT-OUT
5 ATTENUATION IN PSCC BEYOND THE BOARD'S CUT-OUT
6 THREE-PHASE SUPPLIES TO SMALLER
INSTALLATIONS CONSISTING ONLY OF
SINGLE-PHASE EQUIPMENT
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.