ENA TS 43-8 : ISSUE 4 AMD 1 2016

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

OVERHEAD LINE CLEARANCES

Superseded date

06-02-2020

Published date

12-01-2013

Describes the minimum clearances between ENAMC overhead lines at all nominal system voltages and objects, ground, railway property and other ENAMC overhead lines.

DevelopmentNote
Supersedes ENA ER L11-4. (05/2002)
DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Superseded
SupersededBy
Supersedes

ENA TS 43-11 : ISSUE 1 AMD 1 1996 400 KV STEEL TOWER TRANSMISSION LINES - SPECIFICATION L.12 (2 X 700 MM[2] AAAC PER PHASE) (1 X 425 MM[2] AAAC EARTH WIRE)
ENA TS 43-6 : ISSUE 2 AMD 1 1996 CONSTRUCTION OF OVERHEAD TRANSMISSION LINES ON STEEL TOWERS FOR 132 KV AND HIGHER VOLTAGES
ENA TS 43-1 : ISSUE 2 AMD 1 1993 SURVEY AND PREPARATION OF GROUND LINE PROFILES AND PLOTTING OF TOWER POSITIONS FOR STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES
ENA TS 43-2 : ISSUE 1 AMD 1 1996 DESIGN OF STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES
ENA ER G81-7 : ISSUE 2 2016 FRAMEWORK FOR CONTESTABLE DIVERSIONARY AND REINFORCEMENT WORKS NOT EXCEEDING 33 KV - PART 7: CONTESTABLE DIVERSIONARY AND REINFORCEMENT WORKS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.