Customer Support: +44 (0)203 327 3140

Your region & currency

United Kingdom English(GB)

Pricing in GBP £

Local sites

  • Shopping Cart
    There are no items in your cart

We noticed you are browsing from United States. Switch to our United States site for local pricing in USD.

Dismiss alert

I.S. TS 14825:2004

Superseded

Superseded

View Superseded by

AIR CONDITIONERS, LIQUID CHILLING PACKAGES AND HEAT PUMPS WITH ELECTRICALLY DRIVEN COMPRESSORS FOR SPACE HEATING AND COOLING - TESTING AND RATING AT PART LOAD CONDITIONS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2004

Superseded date

02-04-2012

Superseded by

I.S. EN 14825:2016

£29.06
Excluding VAT
Summarise this standard

Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Reduced capacity test
  4.1 Test apparatus
  4.2 Test conditions
  4.3 Test procedures
  4.4 Test tolerances
  4.5 Output measurement
5 Calculation
6 Uncertainties of measurement
7 Test report
8 Technical data sheet
Annex A (informative) Test conditions for reduced capacities
        that differ form 50%
      A.1 For fixed capacity unit
      A.2 For step controlled variable capacity units
      A.3 For continuous controlled variable capacity units

Includes testing of air conditioners, heat pumps and liquid chilling packages for part load conditions. Also specifies the terms, the definitions, the methods for testing and reporting, and the calculation method for the cyclic and compressor reduced capacity.

DocumentType
Standard
Pages
12
PublisherName
National Standards Authority of Ireland
Status
Superseded
SupersededBy

Standards Relationship
CEN/TS 14825 : 2003 Identical

⚠

A newer version of this standard is available.

View Current Edition
£29.06
Excluding VAT