• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

MIL-STD-2137 Revision A:1993

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

WEIGHT CONTROL TECHNICAL REQUIREMENTS FOR SURFACE SHIPS

Available format(s)

PDF

Superseded date

13-09-2005

1. SCOPE
   1.1 Scope
   1.2 Reports interface
2. APPLICABLE DOCUMENTS
   2.1 Government documents
   2.2 Non-Government publications
   2.3 Order of precedence
3. DEFINITIONS
   3.1 Accepted Ship Report (ASR)
   3.2 Accepted Weight Estimate (AWE)
   3.3 Acquisition margins
   3.4 Actual weight
   3.5 Allocated Baseline Weight Estimate (ABWE)
   3.6 Baseline Weight Estimate (BWE)
   3.7 Bidder's Independent Weight Estimate (BIWE)
   3.8 Calculated weight
   3.9 Capacity Load Condition (Condition E)
   3.10 Category
   3.11 Category system
   3.12 Contract Data Requirements List (CDRL) (DD Form
        1423)
   3.13 Contract design margin
   3.14 Contract Design Weight Estimate (CDWE)
   3.15 Contract modification margin
   3.16 Contract modification summary
   3.17 Contractor-responsible condition
   3.18 Current weight
   3.19 Design and Weight Data Sheet
   3.20 Detail design and building margin
   3.21 Estimated weight
   3.22 Expanded Ship Work Breakdown Structure (ESWBS)
   3.23 Feasibility Study Weight Estimate
   3.24 Final Weight Report (FWR)
   3.25 Full Load Condition (Condition D)
   3.26 Government-Furnished Material (GFM) margin
   3.27 Government-Furnished Material summary
   3.28 Group
   3.29 Gyradius
   3.30 Inch-pound units
   3.31 Inclining experiment
   3.32 KG
   3.33 Light Ship Condition (Condition A)
   3.34 Longitudinal lever
   3.35 Magnetic media
   3.36 Mass properties data
   3.37 Metric units
   3.38 Moment
   3.39 Percent completion
   3.40 Performance-type contract
   3.41 Pitch moment of inertia
   3.42 Preliminary Allocated Baseline Weight Estimate
        (PABWE)
   3.43 Preliminary design margin
   3.44 Preliminary Design Weight Estimate
   3.45 Quarterly Weight Report (QWR)
   3.46 Roll moment of inertia
   3.47 Service Life Allowances
   3.48 SI units (International Systems of Units)
   3.49 Specification-type contract
   3.50 Standard longitudinal station breakdown
   3.51 Three-digit system
   3.52 Transverse lever
   3.53 Vertical lever
   3.54 Weight control
   3.55 Weight control plan
   3.56 Weight distribution
   3.57 Weight moment of inertia
   3.58 Weight reporting
   3.59 Yaw moment of inertia
4. GENERAL REQUIREMENTS
   4.1 Determination of mass properties data
   4.2 General report requirements
   4.3 Classified reports
5. DETAILED REQUIREMENTS
   5.1 Preliminary/contract design phases
   5.2 Pre-award process
   5.3 Detail design and construction phase
6. NOTES
   6.1 Intended use
   6.2 Issue DODISS
   6.3 Data requirements
   6.4 Subject term (key word) listing
   6.5 Changes from previous issue
FIGURES
APPENDIX INPUT DATA FILE FORMAT AND TRANSFER

Describes the weight estimate and report content and procedures for all design phases of surface ship acquisition from preliminary design to detail design and construction.

Committee
AREA MISC
DevelopmentNote
Supersedes DOD STD 2137. A NOTICE 1 - Notice of Cancellation without replacement. A NOTICE 2 - Notice of Cancellation/Superseded by by ASTM F 1808, SAWE-RP12 and SAWE-RP13. (09/2005)
DocumentType
Standard
Pages
58
PublisherName
US Military Specs/Standards/Handbooks
Status
Superseded
Supersedes

MIL D 5480 : F DATA, ENGINEERING AND TECHNICAL REPRODUCTION REQUIREMENTS FOR
DOD-STD-1690 Base Document:1979 MARITIME METRIC PRACTICE GUIDE

£15.36
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.