• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 14620-5 : DRAFT 2003

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

DESIGN AND MANUFACTURE OF SITE BUILT, VERTICAL, CYLINDRICAL, FLAT-BOTTOMED STEEL TANKS FOR THE STORAGE OF REFRIGERATED, LIQUEFIED GASES WITH OPERATING TEMPERATURES BETWEEN -5 DEGREE C AND -165 DEGREE C - PART 5: TESTING, DRYING, PURGING AND COOL-DOWN

Published date

12-01-2013

Superseded date

01-09-2006

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Hydrostatic and pneumatic testing
  4.1 Hydrostatic test
  4.2 Pneumatic test
5 Drying, purging and cool-down
  5.1 Drying
  5.2 Purging
  5.3 Cool-down
Annex A (informative) Cool-down of the tank
Bibliography

Describes the requirements for testing, drying, purging and cool-down of the refrigerated liquefied gas storage tanks.

Committee
TC 265
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded

Standards Relationship
03/105152 DC : DRAFT MAR 2003 Identical

Sorry this product is not available in your region.