• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 16602-70-39 : DRAFT 2016

Current

Current

The latest, up-to-date edition.

SPACE PRODUCT ASSURANCE - PART 70-39: WELDING OF METALLIC MATERIALS FOR FLIGHT HARDWARE

Published date

08-03-2016

Sorry this product is not available in your region.

European foreword
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 Principles
5 Welding design
6 Welding and inspection personnel
7 Equipment and facilities
8 Welding procedure specification (WPS)
9 Weld inspection
10 Weld acceptance criteria
11 Welding process verification
12 Flight hardware production
13 Quality assurance
Annex A (normative) - Welding Procedure
        Specification (WPS) - DRD
Annex B (normative) - Welding Verification
        Test Plan (WVTP) - DRD
Annex C (informative) - Inner
        defect calculation
Bibliography

Describes the processing and quality assurance requirements for the different types of metallic welding (manual, automatic, semi-automatic and machine) for space flight applications.

Committee
TC 5
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Current

DIN 65153:1997-06 AEROSPACE - ACCEPTANCE TESTING OF PLASMA ARC WELDING EQUIPMENT
DIN 29595:2007-04 Welding in aerospace - Fusion welded metallic components - Requirements

Sorry this product is not available in your region.