• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

SCTE 165-14 : 2009

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

IPCABLECOM 1.5 - PART 14: EMBEDDED MTA ANALOG INTERFACE AND POWERING

Published date

12-01-2013

Superseded date

06-03-2019

Superseded by

SCTE 165-14:2019

Sorry this product is not available in your region.

1 INTRODUCTION
  1.1 PURPOSE
  1.2 SCOPE
  1.3 MOTIVATION
  1.4 DOCUMENT OVERVIEW
  1.5 REQUIREMENTS SYNTAX
2 REFERENCES
  2.1 NORMATIVE
  2.2 INFORMATIVE
  2.3 REFERENCE ACQUISITION
3 TERMS AND DEFINITIONS
4 ABBREVIATIONS AND ACRONYMS
5 INTRODUCTION
  5.1 IPCABLECOM OVERVIEW
  5.2 SERVICE GOALS
  5.3 IPCABLECOM REFERENCE ARCHITECTURE
  5.4 IPCABLECOM SPECIFICATIONS
  5.5 E-MTA MONITORING REQUIREMENTS
  5.6 E-MTA ALARMS
  5.7 E-MTA TELEMETRY
6 E-MTA POWER REQUIREMENTS
  6.1 POWER CONSIDERATIONS
  6.2 TYPICAL E-MTA TRAFFIC MODEL
  6.3 POWER PASSING TAP LIMITATIONS
  6.4 AVERAGE POWER CALCULATIONS
  6.5 POWER FACTOR CONSIDERATIONS
  6.6 E-MTA AVERAGE POWER REQUIREMENTS
  6.7 SERVICE REQUIREMENTS UNDER AC FAIL CONDITIONS
  6.8 POWER SOURCE COMPATIBILITY 6.9 NETWORK POWERING
  6.9 NETWORK POWERING
  6.10 LOCAL POWERING WITH BATTERY BACKUP
7 MTA ANALOG PORT REQUIREMENTS
  7.1 LOOP START SIGNALING
  7.2 GENERAL SUPERVISION
  7.3 GENERAL RINGING
  7.4 VOICE GRADE ANALOG TRANSMISSION

Describes requirements for the E-MTA analog interface and for powering of the E-MTA.

DocumentType
Standard
PublisherName
Society of Cable Telecomm Engineers
Status
Superseded
SupersededBy

SCTE 165-16 : 2016 IPCABLECOM 1.5 - PART 16: MANAGEMENT EVENT MECHANISM

TA NWT 000909 : ISSUE 2 GENERIC REQUIREMENTS AND OBJECTIVES FOR FIBER IN THE LOOP SYSTEMS
SCTE 165-3 : 2016 IPCABLECOM 1.5 - PART 3: NETWORK-BASED CALL SIGNALING PROTOCOL
TR NWT 000303 : ISSUE 2 SUPP 1 INTEGRATED DIGITAL LOOP CARRIER SYSTEM GENERIC REQUIREMENTS, OBJECTIVES, AND INTERFACE (A MODULE OF TSGR, FR-NWT-000440)
SCTE 165-1 : 2009 IPCABLECOM 1.5 - PART 1: ARCHITECTURE FRAMEWORK TECHNICAL REPORT
GR 517 CORE : ISSUE 1 GENERIC REQUIREMENTS FOR TRAFFIC CAPACITY AND ENVIRONMENT FOR VOICE AND DATA ACCESS TO ATM AND IP CORE NETWORKS
SCTE 135-5 : 2017 DOCSIS 3.0 - PART 5: CABLE MODEM TO CUSTOMER PREMISE EQUIPMENT INTERFACE
SCTE 165-16 : 2016 IPCABLECOM 1.5 - PART 16: MANAGEMENT EVENT MECHANISM
GR 499 CORE : ISSUE 4 TRANSPORT SYSTEMS GENERIC REQUIREMENTS (TSGR): COMMON REQUIREMENTS
SCTE 23-1 : 2017 DOCSIS 1.1 - PART 1: RADIO FREQUENCY INTERFACE
SCTE 23-3 : 2017 DOCSIS 1.1 - PART 3: OPERATIONS SUPPORT SYSTEM INTERFACE
SCTE 165-2 : 2016 IPCABLECOM 1.5 - PART 2: AUDIO/VIDEO CODECS

Sorry this product is not available in your region.