• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

SR 3581 : ISSUE 2

Current

Current

The latest, up-to-date edition.

GR-303 OPERATIONS MIGRATION STRATEGY

Published date

12-01-2013

Sorry this product is not available in your region.

Issue 1 of this special report gave the initial view of the migration plan and firmly established the need to transition GR-303-CORE, "Integrated Digital Loop Carrier System Generic Requirements, Objectives, and Interface", to a standards-based, TMN-compatible operations environment. Issue 2 documents the current state of the GR-303 stakeholder discussions regarding the migration strategy by identifying the existing agreements as well as open items, and also continues to develop the operations migration strategy that guides GR-303 integrated access system products and their managing systems through the introductory stage and two widespread deployment.

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

GR 2833 ILR : ISSUE 3A GENERIC OPERATIONS INTERFACES USING OSI TOOLS: INFORMATION MODEL FOR IDLC AND FITL SYSTEMS ISSUES LIST REPORT
GR 2833 CORE : ISSUE 3 REV 2 GENERIC OPERATIONS INTERFACES USING OSI TOOLS: INFORMATION MODEL FOR INTEGRATED DIGITAL LOOP CARRIER AND FIBER IN THE LOOP SYSTEMS

Sorry this product is not available in your region.