• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

XP P98 142-1 : 2003 XP

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MANUFACTURE OF MIXTURES - PART 1: PRODUCTION CONTROL OF HOT MIX ASPHALTS USING A DATA ACQUISITION SYSTEM

Superseded date

18-01-2023

Published date

12-01-2013

1 Domaine d'application
2 Références normatives
3 Termes et définitions
4 Constitution de la centrale
5 Vérification préalable de la conformité des constituants
6 Vérification et calibrage de la centrale
  6.1 Généralités
  6.2 Information à fournir par le système d'acquisition de
      données
  6.3 Inspection
  6.4 Calibrage des doseurs
  6.5 Vérification du respect de la formule
7 Épreuve de controle de fabrication en production courante
  7.1 Généralités
  7.2 Vérification de la validité des informations fournies
      par le système d'acquisition de données
  7.3 Analyse de l'enrobé

Le présent document a pour objet la définition des modalités de controle de fabrication d'une centrale d'enrobage à chaud équipée d'un système d'acquisition de données. Il s'applique: - aux centrales continues et discontinues équipées d'une table de pesage sur le transporteur avant le sécheur; - aux centrales continues équipées d'un débitmètre massique ou volumique. Les centrales concernées sont des centrales de niveau 2 conformes à l'Annexe de la NF P 98-150.

DevelopmentNote
Indice de classement: P98-142-1XP. XP P98 142-1 December 2003. (01/2004)
DocumentType
Miscellaneous Product
PublisherName
Association Francaise de Normalisation
Status
Superseded
SupersededBy

NFP 98 744-3 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 3: AGGREGATE VOLUMETRIC DOSING MACHINE
NFP 98 744-7 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 7: POWDER WEIGHING DOSING MACHINE WITH TOTAL WEIGHED SCREW - SUBSTANCE WEIGHING TEST
XP P98 772-2 : 2004 XP ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULES FOR GRANULAR MIX FABRICATION PLANTS - DESCRIPTION AND FUNCTIONAL SPECIFICATIONS - PART 2: DISCONTINUOUS PRODUCTION MODULE
NFP 98 744-2 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 2: AGGREGATE WEIGHING DOSING MACHINE
NFP 98 744-4 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 4: DRY BULK WEIGHING DOSING MACHINE - BELT SAMPLING TEST
NFP 98 744-5 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 5: DRY BULK WEIGHING DOSING MACHINE - SUBSTANCE WEIGHING TEST
NFP 98 150-1 : 2010 BITUMINOUS ASPHALTS - LAYING OF PAVEMENT BASES, BINDER AND WEARING COURSES - PART 1: HOT-MIX ASPHALTS - CONSTITUENTS, FORMULATION, FABRICATION, TRANSPORT, LAYING AND SITE INSPECTION

NFP 98 701 : 1993 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MATERIAL PROCESSING PLANTS - TERMINOLOGY AND PERFORMANCES
NFP 98 744-2 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 2: AGGREGATE WEIGHING DOSING MACHINE
NFP 98 744-3 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 3: AGGREGATE VOLUMETRIC DOSING MACHINE
NFP 98 744-1 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 1: BELT FLOW METER FOR BELT CONVEYOR
NFP 98 772 : 96 XP MATERIELS DE CONSTRUCTION ET D'ENTRETIEN DES ROUTES - MODULE D'ACQUISITION DE DONNEES POUR LES CENTRALES DE FABRICATION DES MELANGES GRANULAIRES - DESCRIPTION ET SPECIFICATIONS FONCTIONNELLES - MODULE POUR LA FABRICATION EN CONTINU
NFP 98 744-5 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 5: DRY BULK WEIGHING DOSING MACHINE - SUBSTANCE WEIGHING TEST
NF EN 12697-2 : 2015 BITUMINOUS MIXTURES - TEST METHODS - PART 2: DETERMINATION OF PARTICLE SIZE DISTRIBUTION
NF EN 12697-1 : 2012 BITUMINOUS MIXTURES - TEST METHODS FOR HOT MIX ASPHALT - PART 1: SOLUBLE BINDER CONTENT
NFP 98 150 : 1992 BITUMINOUS ASPHALT - LAYING OF BASE, BINDER AND SURFACE COURSES - COMPONENTS - MIX CONTENTS - PERFORMANCE AND CHECKS
NFP 98 744-4 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 4: DRY BULK WEIGHING DOSING MACHINE - BELT SAMPLING TEST
NF EN 12697-27 : 2017 BITUMINOUS MIXTURES - TEST METHODS - PART 27: SAMPLING

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.