ACMP-2 : 2007
Withdrawn
Withdrawn
NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION
Published date
01-01-2007
Publisher
Withdrawn date
07-23-2013
Sorry this product is not available in your region.
FOREWORD
1. SCOPE
1.1 Purpose
1.2 Applicability
2. RELATED DOCUMENTS
2.1 NATO Documents
2.2 Order of Precedence
2.3 Detailed Guidance
3. DEFINITIONS
4. CONTRACTUAL REQUIREMENTS
4.1 Configuration Item (CI) Selection
4.2 Configuration Baselines
4.3 Maintenance of Configuration Documentation
Specifies uniform requirements for the configuration identification of all items designated for CM.
| DocumentType |
Standard
|
| PublisherName |
NATO
|
| Status |
Withdrawn
|
| ACMP-1 : 2007 | NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS |
| AAP-48 : 2013 | NATO SYSTEM LIFE CYCLE STAGES AND PROCESSES |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-7 : 2007 | NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6 |
| ACMP-7 : 2007 | NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6 |
| ACMP-5 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION AUDITS |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| ACMP-1 : 2007 | NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS |
| STANAG 4159 : 0 | NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS |
Summarise
Sorry this product is not available in your region.