ACMP-7 : 2007
Withdrawn
NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6
01-01-2007
03-24-2023
FOREWORD
1 SCOPE
1.1 Purpose
2 RELATED DOCUMENTS
2.1 NATO Documents
2.2 Order of Precedence
3 DEFINITIONS
4 GENERAL GUIDANCE
4.1 General
4.2 Objectives
5 DETAILED GUIDANCE
5.1 Use of ACMP 1 to 5
5.2 Use of ACMP-6
5.3 Contractual Configuration Management Requirements
5.4 Guidance on ACMP-1: NATO Requirements for the Preparation
of Configuration Management Plans
5.5 Guidance on ACMP-2: NATO Requirements for Configuration
Identification
5.6 Guidance on ACMP-3: NATO Requirements for Configuration
Control - Engineering Changes, Deviations and Waivers
5.7 Guidance on ACMP-4: NATO Requirements for Configuration
status accounting and configuration data management
5.8 Guidance on ACMP-5: NATO Requirements for Configuration
Audits
ANNEX A - Engineering Change Proposal (ECP)
ANNEX B - Notice of Revision (NOR)
ANNEX C - Request for Deviation/Waiver Form
Gives general information and guidance to PM's on the use of ACMP 1 to 6.
| DocumentType |
Standard
|
| PublisherName |
NATO
|
| Status |
Withdrawn
|
| ARMP-9 : 2009 | GUIDE TO THE MANAGEMENT OF SOFTWARE R&M |
| ACMP-1 : 2007 | NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-5 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION AUDITS |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| ACMP-2 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION |
| AAP-48 : 2013 | NATO SYSTEM LIFE CYCLE STAGES AND PROCESSES |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-5 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION AUDITS |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-2 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| STANAG 4159 : 0 | NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS |