ACMP-5 : 2007
Withdrawn
Withdrawn
NATO REQUIREMENTS FOR CONFIGURATION AUDITS
Published date
01-01-2007
Publisher
Withdrawn date
03-24-2023
Sorry this product is not available in your region.
FOREWORD
1 SCOPE
1.1 Purpose
1.2 Applicability
2 RELATED DOCUMENTS
2.1 NATO Documents
2.2 Order of Precedence
2.3 Detailed Guidance
3 DEFINITIONS
4 GENERAL REQUIREMENTS
5 DETAILED REQUIREMENTS
5.1 Functional Configuration Audit
5.2 Physical Configuration Audit
Describes the requirements for the conduct of Configuration Management Audits on Configuration Items (CI).
| DocumentType |
Standard
|
| PublisherName |
NATO
|
| Status |
Withdrawn
|
| ACMP-1 : 2007 | NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| AAP-48 : 2013 | NATO SYSTEM LIFE CYCLE STAGES AND PROCESSES |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| ACMP-2 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION |
| ACMP-7 : 2007 | NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6 |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-7 : 2007 | NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6 |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| ACMP-1 : 2007 | NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS |
| STANAG 4159 : 0 | NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS |
Summarise
Sorry this product is not available in your region.