CONTROL SYSTEMS IN THE PROCESS INDUSTRY - ELECTRICAL AND INSTRUMENTATION LOOP CHECK

Published date

12-01-2013

Sorry this product is not available in your region.

INTRODUCTION
1 Scope
2 Terms and definitions
3 Abbreviations
4 The order of loop check and cold commissioning
  in the project schedule
5 Loop-check content
  5.1 Included activities
  5.2 Excluded activities
6 Loop check procedure
  6.1 Documentation check
  6.2 Visual inspection
  6.3 Function check
  6.4 Checkout of E&I infrastructure and E&I concepts
  6.5 Additional tests - Quality and safety relevant
      loops
7 Documents and test sheets
  7.1 Input documents
  7.2 Test sheets
  7.3 Documents generated upon completion of loop check
  7.4 Loop-check results
8 Quality assurance
9 Safety aspects
Annexe A (informative) Test report for analogue input loop
Annexe B (informative) Test report for binary input loop
Annexe C (informative) Test report for analogue output loop
Annexe D (informative) Test report for binary output loop
Annexe E (informative) Test report for motors and variable
         frequency drives

Defines the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning.

DevelopmentNote
Indice de classement: C46-030. PR NF EN 62382 February 2006. (02/2006) PR NF EN 62382 November 2010. (12/2010)
DocumentType
Standard
PublisherName
Association Francaise de Normalisation
Status
Current

Standards Relationship
DIN EN 62382 : 2014 Identical
IEC 62382:2012 Identical
NBN EN 62382 : 2013 Identical
I.S. EN 62382:2013 Identical
EN 62382:2013 Identical
BS EN 62382:2013 Identical

Sorry this product is not available in your region.